CFCU COURT OF APPEAL IN DIYARBAKIR

The total construction area of the Court Appeal Building Project, which was implemented under the European Union Financing, is 15,000 m2. Reinforced Concrete Framed building system, aluminum siding, and limra stone mechanical assembly façade coating were used.

diyarbakir

CONSTRUCTION OF A TAX OFFICE IN SINCAN

Sincan Tax Office building, which has a total construction area of 7,560 m2, was completed within a short period of 3 months and delivered to the Administration.

sincan-vergi-dairesi

CONSTRUCTION OF GBH BUILDING IN MALATYA

The construction of 63 meters long GBH building, which has a total construction area of 18,060 m2, was completed and delivered to the Administration.

128

CONSTRUCTION OF HEALTH EDUCATION CENTER COMPLEXES IN 4 REGIONS

The project was planned and financed by the World Bank. It was realized under articles of the FIDIC contract. Total construction area of the healthcare complexes, each having 50 beds, is 12,100 m2 and they were built in Malatya, Elazig, Tunceli, and Bingol provinces. Parsons Brinckerhoff Corp. (US) performed the project inspection and technical consultancy.

saglik-egitim

ALMATY FINANCE CENTER

The construction of two blocks in this finance center project, which has a total construction area of nearly 1,00,000 m2 and which consists of 4 blocks, have been completed and delivered to the employer. Construction of the remaining parts of this finance center project is continued by using the cutting-edge technologies and systems and it will be delivered to the administration by completing landscape works too.

almaty

CONSTRUCTION OF THE BUILDING PART OF GULHANE MILITARY MEDICAL ACADEMY (GATA)

Installation of the entire mechanical equipment, electric works, and HVAC system was performed.

gulhane-askeri

SPORTS CENTER IN GIRESUN, BULANCAK

The construction of an indoor sports center for 750 persons was performed.

132

HPP OPERATION BUILDING IN OYMAPINAR AND AKSEHIR II TM LINE SET BUILDING

The construction of an administrative building was performed on a total construction area of 5,200 m2.

133

PRESENTATION BUILDING FOR THE CANAKKALE EPIC

İçerik
Name of Project : Presentation Building for the Canakkale Epic
Place of Project : Gallipoli Peninsula
Employer : General Directorate of Nature Conservation and National Parks
Period of Project : 303 days