NOBEL PHARMACEUTICAL PLANT CONSTRUCTION – ALMATY

The construction of the pharmaceutical plant with a construction area of 5,500 m2 was delivered within 180 days and successfully delivered to Nobel Ilac.

nobel

COAL WASHING PLANT CONSTRUCTION IN SOMA

Soma Coal Washing Plant was successfully put into operation in 2005 as the biggest coal washing plant in terms of capacity in Turkey and Europe and that plant is installed on an area of 25,000 m2.The facility has been designed to operate at an annual production capacity of 7 million tons and it currently operated at a capacity of 800 tons/hour. The project designing and engineering of the plant were made by British Dorr – Oliver company, which is the world’s giant in this sector, and 3,000 tons of steel was used in the erection of this facility. A part of the equipment was supplied from British Conn-Welt company while the other parts thereof from the US CMI company and Swiss Metso company. The total investment amounts to nearly USD 15 million.

soma

FLOUR MILL CONSTRUCTION IN ZONGULDAK

The construction of this mill with a capacity of 200 tons/day was completed on a turn-key basis.

78

CEMENT PLANT CONSTRUCTION IN ERGANI

Within the scope of this project, 275,000 m3 excavation works were done and the construction of a cement plant with a 600,000 tons/year capacity was completed.

79

CEMENT PLANT CONSTRUCTION IN SIIRT, KURTALAN

Within the scope of this project, 600,000 m3 excavation works were done and the construction of a cement plant with a 900,000 tons/year capacity was completed on a turn/key basis together with the management and social buildings, machinery, and all types of units, equipment, and systems including installation thereof.

80

CEMENT PLANT, CLINKER GRINDER, AND BUNKER CONSTRUCTION IN ADIYAMAN

Within the scope of this project, 200,000 m3 excavation works were done and the construction of a cement plant with a 400,000 tons/year capacity was completed.

adiyaman-cimento

TOBACCO WAREHOUSE CONSTRUCTION IN HATAY

The construction of a 15,000 m2 precast tobacco warehouse was completed.

hatay

ADDITIONAL CEMENT PLANT, GRINDER, AND BUNKER CONSTRUCTION IN ISKENDERUN

Industrial works, reinforced concrete, and steel construction.

SANYO DIGITAL CAMERA

CEMENT PLANT IN DENIZLI

The cement plant construction was completed on a turn-key basis including the installation of management and social facilities, machinery, and all types of units, equipment, and system.

84

STAGE 1 CONSTRUCTION OF ARI SMALL INDUSTRIAL SITE COOPERATIVE WITH LIMITED LIABILITY

The construction of this industrial site with a construction area of 66,280 m2 was completed together with all of the infrastructure, landscape, and vehicle road works.

ari-kucuk-sanayii

CONSTRUCTION OF 318 WORKPLACES AND A SOCIAL FACILITY AT ELBISTAN INDUSTRIAL SITE

The construction of 318 industrial workplaces and a social facility with a construction area of 104,327 m2 was completed together with all of the infrastructure, landscape, and vehicle road works.

131