ANATOLIAN TEACHER TRAINING HIGH SCHOOL IN ADIYAMAN, MERKEZ

512 houses, a school building, trade center, community clinic, mosque, in-block roads, and landscape works were completed and delivered to the Administration within the scope of this project that has a total construction area of 80,000 m2.

101

ANATOLIAN TEACHER TRAINING HIGH SCHOOL IN TRABZON, BESIKDUZU

The school complex construction that contains dormitories, a cafeteria, and an indoor sports hall covers a total area of 11,549 m2.

102

INDUSTRIAL VOCATIONAL HIGH SCHOOL CONSTRUCTION IN ISTANBUL, UMRANIYE

The school complex construction covers a total area of 10,618 m2 together with laboratories and workshops.

103

MULTIPURPOSE HIGH SCHOOL CONSTRUCTION IN OSMANIYE, KADIRLI

The school has a capacity of 720 students and covers a total construction area of 7,015 m2.

104

ANTALYA MANAVGAT TİCARET MESLEK LİSESİ İNŞAATI

This school has a capacity of 480 students and the construction covers a total area of 5,020 m2.

105

MULTIPURPOSE HIGH SCHOOL CONSTRUCTION IN K.MARAS, AFSIN

The school has a capacity of 480 students and covers a total area of 7,015 m2.

cobanbeyli

ANATOLIAN TEACHER TRAINING HIGH SCHOOL IN K.MARAS, MERKEZ

The school has a capacity of 240 students and covers a total area of 2,628 m2.

107

SCHOOL COMPLEX AND DORMITORY CONSTRUCTION IN BINGOL, CITY CENTER

The construction of the school complex, which consists of a dormitory for girls and boys, a mixed-sex dormitory for 300 students, a cafeteria building, and two educational buildings, covers a total construction area of 25,879 m2. The construction works were completed within 10 months.

108

PRIMARY SCHOOL COMPLEX IN BINGOL

4 schools were constructed in different locations of Bingol on a total construction area of 20,416 m2. The project was completed within 10 months.

109

INDUSTRIAL SCHOOL COMPLEX IN MALATYA, MERKEZ

The educational complex was built together with an educational building, electrics – electronics – telecommunication workshops, and a chemistry workshop building. Total construction area is 12,883 m2.

p10

INDUSTRIAL SCHOOL COMPLEX

111 Name of Project : Industrial School Complex – 2002
Place of Project : İstanbul, Turkey
Employer : Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Period of Orject
: 11 months
Construction Area : 16.417 m2

INDUSTRIAL SCHOOL COMPLEX

112 Name of Project : Industrial School Complex – 2002
Place of Project : Ankara, Turkey
Employer : Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Period of Project
: 11 months
Construction Area : 15.729 m2

CONSTRUCTION OF 2 SCHOOLS WITH 960-STUDENT CAPACITY IN DUZCE, MERKEZ

113 Name of Project : Construction of 2 Schools with 960-Student Capacity in Duzce, Merkez – 2002
Place of Project : Duzce, Turkey
Employer : Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Period of Project : 10 months
Construction Area : 13.480 m2

CONSTRUCTION OF PRIMARY SCHOOL COMPLEXES IN MALATYA, MERKEZ & DARENDE

114 Name of Project : Construction of Primary School Complexes in Malatya, Merkez & Darende – 2002
Place of Project : Malatya, Turkey
Employer : Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Period of Project : 12 months
Construction Area : 11.875 m2

CONSTRUCTION OF 3 HIGH SCHOOLS IN ANKARA

Complementary construction works were completed within 1 month.

3-adet-lise

CONSTRUCTION OF 2 HIGH SCHOOLS IN ANKARA

Complementary construction works were completed within 1 month.

p19

CONSTRUCTION OF 2 HIGH SCHOOLS IN ANKARA

Complementary construction works were completed within 1 month.

p36

CONSTRUCTION OF 2 HIGH SCHOOLS IN MERSIN

Fulfillment of complementary construction works.

118

CIVIL WORKS FOR ANAFARTALAR PRIMARY SCHOOL

The total construction area of the school, which has a capacity of 240 students, covers an area of 3,100 m2.

anafartalar

CONSTRUCTION OF 4 NEW SCHOOLS AND REPAIR OF 3 EXISTING SCHOOLS IN ANKARA

The project was planned and financed by the World Bank. It was realized under FIDIC contracts. Total construction area is 9,400 m2.

ncb

CONSTRUCTION OF A SCHOOL COMPLEX AND A DORMITORY (REGIONAL PRIMARY BOARDING SCHOOL) IN TRABZON, ARAKLI BEREKETLI

On an area of 10,000 m2, a school building, a dormitory, a lodging building with 10 flats, a parking garage, a generating set – transformer building, a water reservoir, and a cafeteria were constructed. Total construction area is 6,780 m2.

121

CONSTRUCTION OF 75. YIL IMKB REGIONAL PRIMARY BOARDING SCHOOL WITH A CAPACITY OF 720 STUDENTS IN KARS, SUSUZ, INCESU TOWN

The construction of 3 dormitories and a school complex, 3 buildings with 48 flats for teachers, a dormitory, an indoor gym, and a conference hall was performed on a total area of 18,928 m2 out of an area of 65,000 m2.

122

TOURISM AND HOTEL MANAGEMENT VOCATIONAL SCHOOLS COMPLEX CONSTRUCTION IN ISPARTA, EGIRDIR

Tourism and Hotel Management Vocational High School Complex and a Four-Star Hotel construction was performed on a total area of 14,400 m2.

123

CAVUSLAR PRIMARY SCHOOL CONSTRUCTION IN BINGOL, SOLHAN

bingol Name of Project : Cavuslar Primary School Construction in Bingol, Solhan – 2002
Place of Project : Bingöl, Turkey
Employer : Republic of Turkey, Ministry of National Education, Department of Investment and Facilities
Period of Project : 10 months
Construction Area : 16.040 m2

CONSTRUCTION OF PRIMARY SCHOOLS IN ADIYAMAN / BESNI, ADIYAMAN / CELIKHAN, AND MALATYA / BATTALGAZI

Construction of school complexes in Adiyaman / Besni, Adiyaman / Celikhan, And Malatya / Battalgazi. Total construction area is 14,080 m2.

125